Public Space— The Jem Southbank, QLD

– Completed: 2024

Background

Backgroud Text

Challenge

Challenge text

Solution

 The original lighting and control system,
installed in 2008, was a unique, internationally
acclaimed interactive lighting experience. Over time,
the lighting suffered significant wear and tear, leading
to frequent malfunctions. To avoid the need for a new
control system which would be highly complex and
expensive, we reverse-engineered the original lighting
and custom-manufactured new lights using advanced
chip sets and LEDs that seamlessly integrated with the
existing system in a plug-and-play manner. During a
three week period we replaced the original lighting,
installed the new lights, and improved the control system
for easier maintenance.

Result

Result Text

Tell us about your project and
we'll tell you how to light it

Lightcore logo

🚀 Don’t Miss Out on Exclusive Updates about Our Products, Projects, Services, and Promotions! 💌
We promise we won’t spam you 📭

Join the Newsletter !

Coming Soon.

Exciting things are on the horizon.
Explore our products and get in touch with us to stay in the loop.